中国科学院机构知识库网格
Chinese Academy of Sciences Institutional Repositories Grid
Blocking Flowshop Scheduling Model for Optimising Cubic Criterion with Release Dates

文献类型:期刊论文

作者Liang, Jie2; Hu, Qi-bo3; Cui, Xiao-zhi2; Fu, Yao2; Liu YY(刘意杨)1; Ren T(任涛)2
刊名IEEE Access
出版日期2018
卷号6页码:72179-72188
关键词Blocking Flowshop Metaheuristic Release Date Scheduling
ISSN号2169-3536
产权排序2
英文摘要

Blocking phenomenon occurs in a flowshop that has a limited buffer between any two successive machines. Once the buffer is full, the upstream machine is forbidden to release a finished job. The job has to remain on the machine until the buffer can accommodate it. This study investigates a blocking flowshop scheduling problem, in which each job has its own release date, with the optimal criterion of minimizing the total cubic completion time. Given that the problem is NP-hard, a metaheuristic algorithm can efficiently achieve a near-optimal solution within a due time. On the basis of the properties of job sequencing, simulated annealing, tabu search and genetic algorithm are presented to obtain high-quality solutions for medium-scale problems. A series of random experiments is conducted to show the effectiveness of the proposed algorithms.

WOS关键词SHOP ; TIME ; MAKESPAN ; HEURISTICS ; ALGORITHMS
资助项目National Natural Science Foundation of China[61473073] ; National Natural Science Foundation of China[61104074] ; Fundamental Research Funds for the Central Universities[N161702001] ; Fundamental Research Funds for the Central Universities[N171706003] ; Program for Liaoning Excellent Talents in University[LJQ2014028]
WOS研究方向Computer Science ; Engineering ; Telecommunications
语种英语
WOS记录号WOS:000453702900001
资助机构National Natural Science Foundation of China ; Fundamental Research Funds for the Central Universities ; Program for Liaoning Excellent Talents in University
源URL[http://ir.sia.cn/handle/173321/23667]  
专题沈阳自动化研究所_工业控制网络与系统研究室
通讯作者Liang, Jie
作者单位1.Shenyang Institute of Automation Chinese Academy of Sciences, Shenyang, P.R. China.
2.Department of Software, Northeastern University, Shenyang, P.R. China.
3.Department of Economics Management, Shenyang University of Chemical Technology, Shenyang, P.R. China.
推荐引用方式
GB/T 7714
Liang, Jie,Hu, Qi-bo,Cui, Xiao-zhi,et al. Blocking Flowshop Scheduling Model for Optimising Cubic Criterion with Release Dates[J]. IEEE Access,2018,6:72179-72188.
APA Liang, Jie,Hu, Qi-bo,Cui, Xiao-zhi,Fu, Yao,Liu YY,&Ren T.(2018).Blocking Flowshop Scheduling Model for Optimising Cubic Criterion with Release Dates.IEEE Access,6,72179-72188.
MLA Liang, Jie,et al."Blocking Flowshop Scheduling Model for Optimising Cubic Criterion with Release Dates".IEEE Access 6(2018):72179-72188.

入库方式: OAI收割

来源:沈阳自动化研究所

浏览0
下载0
收藏0
其他版本

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。