中国科学院机构知识库网格
Chinese Academy of Sciences Institutional Repositories Grid
Improved heuristic algorithm for modern industrial production scheduling

文献类型:期刊论文

作者Jiang, Yongqing1; Pan FC(潘福成)2
刊名International Journal of Modelling, Identification and Control
出版日期2018
卷号30期号:4页码:284-292
关键词production management modern industrial heuristic scheduling
ISSN号1746-6172
产权排序2
英文摘要Scheduling is one of the core links of modern industrial production. Scheduling needs to be designed according to the characteristics of the production line. In order to optimise the problem of workshop scheduling, the service-oriented programming idea and advanced technology to optimise the system development of mixed flow shop are adopted. The system is designed for applications in a distributed network environment. In this paper, an improved heuristic industrial production scheduling method is proposed to solve the scheduling system problem with multiple scheduling tasks, multiple processes, multiple stations, multiple constraints and rules. This method specifies the processing equipment, start time and completion time for each process of the production task. The application method shows that the proposed method can improve the automation and intelligence level of the scheduling process, improve the utilisation rate of equipment and other production resources, and give full play to the enterprise production capacity.
语种英语
资助机构Liaoning Province Science and Technology Project (2015106015)
源URL[http://ir.sia.cn/handle/173321/24574]  
专题沈阳自动化研究所_数字工厂研究室
通讯作者Jiang, Yongqing
作者单位1.College of Mechanical Engineering, Chongqing University, Chongqing 100049, China
2.Shenyang Institute of Automation, Chinese Academy of Sciences Shenyang, Nanta Street 114, Shenyang 110016, China
推荐引用方式
GB/T 7714
Jiang, Yongqing,Pan FC. Improved heuristic algorithm for modern industrial production scheduling[J]. International Journal of Modelling, Identification and Control,2018,30(4):284-292.
APA Jiang, Yongqing,&Pan FC.(2018).Improved heuristic algorithm for modern industrial production scheduling.International Journal of Modelling, Identification and Control,30(4),284-292.
MLA Jiang, Yongqing,et al."Improved heuristic algorithm for modern industrial production scheduling".International Journal of Modelling, Identification and Control 30.4(2018):284-292.

入库方式: OAI收割

来源:沈阳自动化研究所

浏览0
下载0
收藏0
其他版本

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。