Improved heuristic algorithm for modern industrial production scheduling
文献类型:期刊论文
作者 | Jiang, Yongqing1; Pan FC(潘福成)2![]() |
刊名 | International Journal of Modelling, Identification and Control
![]() |
出版日期 | 2018 |
卷号 | 30期号:4页码:284-292 |
关键词 | production management modern industrial heuristic scheduling |
ISSN号 | 1746-6172 |
产权排序 | 2 |
英文摘要 | Scheduling is one of the core links of modern industrial production. Scheduling needs to be designed according to the characteristics of the production line. In order to optimise the problem of workshop scheduling, the service-oriented programming idea and advanced technology to optimise the system development of mixed flow shop are adopted. The system is designed for applications in a distributed network environment. In this paper, an improved heuristic industrial production scheduling method is proposed to solve the scheduling system problem with multiple scheduling tasks, multiple processes, multiple stations, multiple constraints and rules. This method specifies the processing equipment, start time and completion time for each process of the production task. The application method shows that the proposed method can improve the automation and intelligence level of the scheduling process, improve the utilisation rate of equipment and other production resources, and give full play to the enterprise production capacity. |
语种 | 英语 |
资助机构 | Liaoning Province Science and Technology Project (2015106015) |
源URL | [http://ir.sia.cn/handle/173321/24574] ![]() |
专题 | 沈阳自动化研究所_数字工厂研究室 |
通讯作者 | Jiang, Yongqing |
作者单位 | 1.College of Mechanical Engineering, Chongqing University, Chongqing 100049, China 2.Shenyang Institute of Automation, Chinese Academy of Sciences Shenyang, Nanta Street 114, Shenyang 110016, China |
推荐引用方式 GB/T 7714 | Jiang, Yongqing,Pan FC. Improved heuristic algorithm for modern industrial production scheduling[J]. International Journal of Modelling, Identification and Control,2018,30(4):284-292. |
APA | Jiang, Yongqing,&Pan FC.(2018).Improved heuristic algorithm for modern industrial production scheduling.International Journal of Modelling, Identification and Control,30(4),284-292. |
MLA | Jiang, Yongqing,et al."Improved heuristic algorithm for modern industrial production scheduling".International Journal of Modelling, Identification and Control 30.4(2018):284-292. |
入库方式: OAI收割
来源:沈阳自动化研究所
浏览0
下载0
收藏0
其他版本
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。