中国科学院机构知识库网格
Chinese Academy of Sciences Institutional Repositories Grid
A neural-based approach to production scheduling

文献类型:会议论文

作者Yu HB(于海斌); Wang HB(王华兵); Xu XH(徐心和); Xue JS(薛劲松)
出版日期1997
会议名称1997 American Control Conference
会议日期June 4-6, 1997
会议地点ALBUQUERQUE, NM
关键词production scheduling neural network job-shop gradient search
页码1027-1031
通讯作者于海斌
中文摘要An effective neural-based approach to production scheduling is proposed in the paper, which is apt for solving complex job-shop scheduling problems with available time and due date constraints, constrained job-shop scheduling. Constraint network (CNN) is introduced to ensure the production constraints satisfied. A gradient search algorithm is applied to optimize the outputs of the CNN. The experiments have shown that the solutions generated by the neural-based approach are optimal scheduling for minimizing the sum of total job's completion times in current processing sequence.
收录类别EI ; CPCI(ISTP)
产权排序1
会议主办者Amer Automat Control Council, Int Federat Automat Control
会议录PROCEEDINGS OF THE 1997 AMERICAN CONTROL CONFERENCE, VOLS 1-6
会议录出版者IEEE
会议录出版地NEW YORK
语种英语
ISSN号0743-1619
ISBN号0-7803-3833-2
WOS记录号WOS:A1997BJ29B00219
源URL[http://ir.sia.cn/handle/173321/7744]  
专题沈阳自动化研究所_沈阳自动化所知识产出(2000年前)
推荐引用方式
GB/T 7714
Yu HB,Wang HB,Xu XH,et al. A neural-based approach to production scheduling[C]. 见:1997 American Control Conference. ALBUQUERQUE, NM. June 4-6, 1997.

入库方式: OAI收割

来源:沈阳自动化研究所

浏览0
下载0
收藏0
其他版本

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。