中国科学院机构知识库网格
Chinese Academy of Sciences Institutional Repositories Grid
Implementing CIMS in Shenyang Blower Works

文献类型:期刊论文

作者Xue JS(薛劲松); Yu HB(于海斌); Mu, Rulin; Lin, Kemin
刊名Integrated Manufacturing Systems
出版日期1999
卷号10期号:2页码:89-94
关键词Concurrent engineering Factory automation Process engineering Product design Product development Production control Scheduling Strategic planning
ISSN号0957-6061
产权排序1
中文摘要Computer-integrated manufacturing (CIM) has been paid serious attention in most of the industrialized countries. Shenyang Blower Works (SBW), the largest enterprise developing, designing and fabricating turbine compressors, blowers and large fans in China, made its production plan according to orders due to its single or small batch production mode. For this SBW decided to adopt the CIM philosophy and build CIM systems (CIMS) to increase the enterprise's market competitiveness. SBW has begun to develop CIMS going through the steps of feasibility study, primary design, detailed design and a partial implementation-breakthrough project since 1990. A relatively perfect computer support environment for the computer-integrated manufacturing system in Shenyang Blower Works (SB-CIMS), especially for the primary integrated application software systems, has been completed. This accounted for various economic benefits.
收录类别EI
语种英语
公开日期2012-10-25
源URL[http://ir.sia.cn/handle/173321/10092]  
专题沈阳自动化研究所_沈阳自动化所知识产出(2000年前)
推荐引用方式
GB/T 7714
Xue JS,Yu HB,Mu, Rulin,et al. Implementing CIMS in Shenyang Blower Works[J]. Integrated Manufacturing Systems,1999,10(2):89-94.
APA Xue JS,Yu HB,Mu, Rulin,&Lin, Kemin.(1999).Implementing CIMS in Shenyang Blower Works.Integrated Manufacturing Systems,10(2),89-94.
MLA Xue JS,et al."Implementing CIMS in Shenyang Blower Works".Integrated Manufacturing Systems 10.2(1999):89-94.

入库方式: OAI收割

来源:沈阳自动化研究所

浏览0
下载0
收藏0
其他版本

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。