Implementing CIMS in Shenyang Blower Works
文献类型:期刊论文
作者 | Xue JS(薛劲松); Yu HB(于海斌)![]() |
刊名 | Integrated Manufacturing Systems
![]() |
出版日期 | 1999 |
卷号 | 10期号:2页码:89-94 |
关键词 | Concurrent engineering Factory automation Process engineering Product design Product development Production control Scheduling Strategic planning |
ISSN号 | 0957-6061 |
产权排序 | 1 |
中文摘要 | Computer-integrated manufacturing (CIM) has been paid serious attention in most of the industrialized countries. Shenyang Blower Works (SBW), the largest enterprise developing, designing and fabricating turbine compressors, blowers and large fans in China, made its production plan according to orders due to its single or small batch production mode. For this SBW decided to adopt the CIM philosophy and build CIM systems (CIMS) to increase the enterprise's market competitiveness. SBW has begun to develop CIMS going through the steps of feasibility study, primary design, detailed design and a partial implementation-breakthrough project since 1990. A relatively perfect computer support environment for the computer-integrated manufacturing system in Shenyang Blower Works (SB-CIMS), especially for the primary integrated application software systems, has been completed. This accounted for various economic benefits. |
收录类别 | EI |
语种 | 英语 |
公开日期 | 2012-10-25 |
源URL | [http://ir.sia.cn/handle/173321/10092] ![]() |
专题 | 沈阳自动化研究所_沈阳自动化所知识产出(2000年前) |
推荐引用方式 GB/T 7714 | Xue JS,Yu HB,Mu, Rulin,et al. Implementing CIMS in Shenyang Blower Works[J]. Integrated Manufacturing Systems,1999,10(2):89-94. |
APA | Xue JS,Yu HB,Mu, Rulin,&Lin, Kemin.(1999).Implementing CIMS in Shenyang Blower Works.Integrated Manufacturing Systems,10(2),89-94. |
MLA | Xue JS,et al."Implementing CIMS in Shenyang Blower Works".Integrated Manufacturing Systems 10.2(1999):89-94. |
入库方式: OAI收割
来源:沈阳自动化研究所
浏览0
下载0
收藏0
其他版本
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。