中国科学院机构知识库网格
Chinese Academy of Sciences Institutional Repositories Grid
Research on the Improved Dragonfly Algorithm-Based Flexible Flow-Shop Scheduling

文献类型:会议论文

作者Han ZH(韩忠华)1,2,3,4; Zhang, Jingyuan1; Lin S(林硕)1; Liu, Chunguang5
出版日期2019
会议日期July 13-15, 2019
会议地点Tianjin, China
关键词Flexible flow-shop Limited buffer Dragonfly algorithm Simulating anneal
页码205-214
英文摘要Compared with the classic flexible flow shop, limited buffer flexible flow shop may have a limited buffer production blockage, which will increase the complexity and uncertainty of the scheduling process. In order to solve the limited-buffer flexible flow-shop scheduling problem (LBFFSP), a mathematical programming model of limited buffer flexible flow shop is established and an Improved Dragonfly Algorithm (IDA) is proposed to solves this problem. Based on the standard Dragonfly Algorithm (DA), the idea of Simulated Anneal (SA) is combined to improve the ability of the algorithm to jump out local extremum and the algorithm combines the standard Dragonfly Algorithm (DA) with the Simulated Anneal (SA) idea to improve the ability to jump out local extremum and improve its persistence.
产权排序1
会议录Proceedings of the 11th International Conference on Modelling, Identification and Control, ICMIC 2019
会议录出版者Springer
会议录出版地Berlin
语种英语
ISSN号1876-1100
ISBN号978-981-15-0473-0
WOS记录号WOS:000612991700020
源URL[http://ir.sia.cn/handle/173321/26137]  
专题沈阳自动化研究所_数字工厂研究室
通讯作者Zhang, Jingyuan
作者单位1.Faculty of Information and Control Engineering, Shenyang Jianzhu University, Shenyang, Liaoning 110168, China
2.Department of Digital Factory, Shenyang Institute of Automation, The Chinese Academy of Sciences (CAS), Shenyang 110016, China
3.Key Laboratory of Network Control System, Chinese Academy of Sciences, Shenyang, Liaoning 110016, China
4.Institutes for Robotics and Intelligent Manufacturing, Chinese Academy of Sciences, Shenyang, Liaoning 110016, China
5.Editorial Department, Journal of Shenyang Jianzhu University, Shenyang, China
推荐引用方式
GB/T 7714
Han ZH,Zhang, Jingyuan,Lin S,et al. Research on the Improved Dragonfly Algorithm-Based Flexible Flow-Shop Scheduling[C]. 见:. Tianjin, China. July 13-15, 2019.

入库方式: OAI收割

来源:沈阳自动化研究所

浏览0
下载0
收藏0
其他版本

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。