A fast real-time scheduling algorithm for WIA-PA
文献类型:会议论文
作者 | Jin X(金曦)![]() ![]() |
出版日期 | 2013 |
会议名称 | 2013 International Forum on Computer and Information Technology, IFCIT 2013 |
会议日期 | December 24-25, 2013 |
会议地点 | Shenzhen, China |
关键词 | Information technology MESH networking Network management Real time systems Scheduling Stars Time division multiple access |
页码 | 124-127 |
中文摘要 | WIA-PA networks have been widely used in industrial monitoring systems, but its real-time performance limits its usage in industrial control systems. And no existing works on real-time scheduling have taken into account all features of WIA-PA. So, in this paper, we propose an algorithm to schedule transmissions under real-time constraints for WIA-PA star-mesh networks. The algorithm is based on hybrid centralized and distributed network management, so it can quickly determine how to schedule transmissions. Experimental results show that our algorithm is fast and efficient. |
收录类别 | EI ; CPCI(ISTP) |
产权排序 | 1 |
会议主办者 | et al; Hong Kong Industrial Technology Research Centre; Inha University; Korea Maritime University; National Chengchi University, Taiwan; Queensland University of Technology |
会议录 | Applied Mechanics and Materials
![]() |
会议录出版者 | Trans Tech Publications |
会议录出版地 | Zurich-Durnten, Switzerland |
语种 | 英语 |
ISSN号 | 1660-9336 |
ISBN号 | 978-3-03835-019-4 |
WOS记录号 | WOS:000348897600023 |
源URL | [http://ir.sia.cn/handle/173321/14574] ![]() |
专题 | 沈阳自动化研究所_工业控制网络与系统研究室 |
推荐引用方式 GB/T 7714 | Jin X,Zeng P. A fast real-time scheduling algorithm for WIA-PA[C]. 见:2013 International Forum on Computer and Information Technology, IFCIT 2013. Shenzhen, China. December 24-25, 2013. |
入库方式: OAI收割
来源:沈阳自动化研究所
浏览0
下载0
收藏0
其他版本
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。