Study on the job shop fuzzy dynamic scheduling based on virtual pre-scheduling
文献类型:会议论文
作者 | Li FM(李富明); Zhu YL(朱云龙)![]() |
出版日期 | 2006 |
会议名称 | 6th World Congress on Intelligent Control and Automation |
会议日期 | June 21-23, 2006 |
会议地点 | Dalian, China |
关键词 | virtual pre-scheduling virtual scheduling pool fuzzy dynamic scheduling Job Shop |
页码 | 7348-7352 |
通讯作者 | 李富明 |
中文摘要 | Dynamic Job Shop scheduling is a frequently occurring and highly relevant problem in practical fuzzy manufacture environment. Previous research suggested that periodic rescheduling improves classical measures of efficiency; however, this strategy had the undesirable effect of compromising stability and this lack of stability could render even the most efficient rescheduling strategy useless on the shop floor. In this research, the concept of the virtual scheduling pool was proposed and the heuristic virtual dynamic scheduling algorithm was also presented on the basis of this concept. This algorithm allows efficiency and stability to be balanced in a way that is appropriate for each situation. The contradistinctive simulations between the algorithm presented in this paper and the one based on the strategy of the temporal decomposition show that the algorithm presented is effective and feasible as well as the scheduling strategy of the former excels of the later in performance measures as a whole. |
收录类别 | EI ; CPCI(ISTP) |
产权排序 | 1 |
会议主办者 | Dalian Univ Technol, Northeastern Univ, Dalian Maritime Univ, Shanghai Baosight Software Co Ltd, IEEE Robot & Automat Soc, Natl Nat Sci Fdn China, Chinese Assoc Automat, IEEE Control Syst Soc, Beijing Chapter, Minist Educ China, Grandar Robot Co Ltd, Yokogawa Elect Corp, KC Wong Educ Fdn, Siemens Ltd |
会议录 | WCICA 2006: Sixth World Congress on Intelligent Control and Automation, Vols 1-12, Conference Proceedings
![]() |
会议录出版者 | IEEE |
会议录出版地 | NEW YORK |
语种 | 英语 |
ISBN号 | 1-4244-0331-6 |
WOS记录号 | WOS:000241773208072 |
源URL | [http://ir.sia.cn/handle/173321/8283] ![]() |
专题 | 沈阳自动化研究所_工业信息学研究室_先进制造技术研究室 |
推荐引用方式 GB/T 7714 | Li FM,Zhu YL,Yin CW,et al. Study on the job shop fuzzy dynamic scheduling based on virtual pre-scheduling[C]. 见:6th World Congress on Intelligent Control and Automation. Dalian, China. June 21-23, 2006. |
入库方式: OAI收割
来源:沈阳自动化研究所
浏览0
下载0
收藏0
其他版本
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。