中国科学院机构知识库网格
Chinese Academy of Sciences Institutional Repositories Grid
机构
采集方式
内容类型
发表日期
学科主题
筛选

浏览/检索结果: 共9条,第1-9条 帮助

条数/页: 排序方式:
ReAccelerator Upgrade, Commissioning and First Experiments at the National Superconducting Cyclotron Laboratory (NSCL) / Facility for Rare Isotope Beams (FRIB) 会议论文  OAI收割
Thailand, 2022
作者:  
A.C.C. Villari;  G. Bollen;  K.D. Davidson;  K. Fukushima;  A.I. Henriques
  |  收藏  |  浏览/下载:11/0  |  提交时间:2023/01/05
Upgrade of the FRIB ReAccelerator 会议论文  OAI收割
USA, 2022
作者:  
A.C.C. Villari;  B. Arend;  G. Bollen;  D.B. Crisp;  K.D. Davidson
  |  收藏  |  浏览/下载:9/0  |  提交时间:2023/01/05
FRIB Commissioning and Early Operations 会议论文  OAI收割
Thailand, 2022
作者:  
J. Wei;  H. Ao;  S. Beher;  G. Bollen;  N.K. Bultman
  |  收藏  |  浏览/下载:22/0  |  提交时间:2023/01/05
Completion of FRIB Superconducting Linac and Phased Beam Commissioning 会议论文  OAI收割
USA, 2021
作者:  
T. Xu;  Y. Al-Mahmoud;  H. Ao;  J. Asciutto;  B. Bird
  |  收藏  |  浏览/下载:10/0  |  提交时间:2023/01/05
Commissioning Status of the FRIB Front End 会议论文  OAI收割
Michigan, 2019
作者:  
H.T. Ren;  J. Brandon;  N.K. Bultman;  K.D. Davidson;  E. Daykin
  |  收藏  |  浏览/下载:22/0  |  提交时间:2021/05/31
FRIB Driver Linac Integration to be ready for Phased Beam Commissioning 会议论文  OAI收割
Michigan, 2019
作者:  
H. Ao;  S. Beher;  N.K. Bultman;  F. Casagrande;  C. Compton
  |  收藏  |  浏览/下载:123/0  |  提交时间:2021/05/31
Installation Progress on FRIB β=0.041 Cryomodules Toward Beam Commissioning 会议论文  OAI收割
Vancouver, BC, Canada, 2018
作者:  
H. Ao;  B. Bird;  N.K. Bultman;  F. Casagrande;  C. Compton
  |  收藏  |  浏览/下载:38/0  |  提交时间:2018/12/21
RF System for FRIB Accelerator 会议论文  OAI收割
Vancouver, BC, Canada, 2018
作者:  
D.G. Morris;  J. Brandon;  N.K. Bultman;  K.D. Davidson;  A. Facco
  |  收藏  |  浏览/下载:29/0  |  提交时间:2018/12/21
The FRIB SC-Linac - Installation and Phased Commissioning 会议论文  OAI收割
Germany, 2019
作者:  
J. Wei;  H. Ao;  S. Beher;  B. Bird;  N.K. Bultman
  |  收藏  |  浏览/下载:14/0  |  提交时间:2020/03/02