中国科学院机构知识库网格
Chinese Academy of Sciences Institutional Repositories Grid
机构
采集方式
内容类型
发表日期
学科主题
筛选

浏览/检索结果: 共3条,第1-3条 帮助

条数/页: 排序方式:
Combined carrier phase and code phase passive radiation source localisation method 期刊论文  OAI收割
IET RADAR SONAR AND NAVIGATION, 2020, 卷号: 14, 期号: 1, 页码: 147-155
作者:  
Li, Youyang;  Wang, Xue;  Lu, Xiaochun
  |  收藏  |  浏览/下载:21/0  |  提交时间:2020/11/09
LABTM control system based on FPGA (EI CONFERENCE) 会议论文  OAI收割
2nd International Conference on Mechatronics and Applied Mechanics, ICMAM 2012, December 8, 2012 - December 9, 2012, Taiwan
作者:  
Wang Y.;  Yu P.;  Yu P.;  Wang Y.;  Wang Y.
收藏  |  浏览/下载:153/0  |  提交时间:2013/03/25
This paper presents the digital PI control method for design and simulation of a high precision limited angle brushless torque motor control system in Field Programmable Gate Array device (FPGA). The direct drive structures which are widely applied in many servo control fields. Matlab Xilinx System GeneratorR toolbox based on Fixed-Point Arithmetic is used to design the digital PI controller using DSP architecture  plot the responses of the control system and generate the VHDL source code. The control system model consists of a digital PI  a real LABTM  and a real absolute Inductosyn  encoder to rpm and position blocks. Through loading generated codes in process of the simulation that built by the digital discrete model  it is verified that the rising time of current loop is only 1.2ms  and rate loop is 8ms  overshoot is rarely 4.2%. Finally  the comprehensive positioning accuracy of system can reach up to 5 arc sec  and the rate jitter achieves 5% with the 4 arc sec accuracy absolute Inductosyn. (2013) Trans Tech Publications  Switzerland.  
A study of the jacking system for ferroalloy electric furnace electrode based on linear motor controlling (EI CONFERENCE) 会议论文  OAI收割
9th International Conference on Electronic Measurement and Instruments, ICEMI 2009, August 16, 2009 - August 19, 2009, Beijing, China
Peng X.; Jiwei Z.
收藏  |  浏览/下载:27/0  |  提交时间:2013/03/25
The current jacking system for the hydraulic electric furnace electrode in Jilin Ferroalloy Factory is adopted the hand control in electrode jacking plan  against this situation  a structure  which can adapt the linear stepping motor to control the digital valve for adjusting the location of the hydraulic system has been raised  and the current system would realize automatic control to the electrode jacking by this way  at the same time  and by Fuzzy-PID control method the linear stepping motor would be controlled to obtain precise positioning in control. The hydraulic system controlled by digital valve have been described and analyzed in jacking feasibility and stability. What's more  it is inspected and verified that the adjustment of this system has high precision and quick response. 2009 IEEE.