中国科学院机构知识库网格
Chinese Academy of Sciences Institutional Repositories Grid
机构
采集方式
内容类型
发表日期
学科主题
筛选

浏览/检索结果: 共26条,第1-10条 帮助

条数/页: 排序方式:
Multi-Agent Reinforcement Learning for Extended Flexible Job Shop Scheduling 期刊论文  OAI收割
MACHINES, 2024, 卷号: 12, 期号: 1, 页码: 25
作者:  
Peng, Shaoming;  Xiong, Gang;  Yang, Jing;  Shen, Zhen;  Tamir, Tariku Sinshaw
  |  收藏  |  浏览/下载:3/0  |  提交时间:2024/03/13
Digital twin oriented multi-objective flexible job shop scheduling model and its hybrid particle swarm optimization 期刊论文  OAI收割
PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2022, 页码: 14
作者:  
Chen, Zhaoming;  Zou, Jinsong;  Wang, Wei
  |  收藏  |  浏览/下载:34/0  |  提交时间:2022/10/14
Differential evolution algorithm with dynamic multi-population applied to flexible job shop schedule 期刊论文  OAI收割
Engineering Optimization, 2022, 卷号: 54, 期号: 3, 页码: 387-408
作者:  
Cao Y(曹阳);  Shi HB(史海波);  Chang DL(常大亮)
  |  收藏  |  浏览/下载:34/0  |  提交时间:2021/03/14
Novel approach to energy-efficient flexible job-shop scheduling problems 期刊论文  OAI收割
ENERGY, 2022, 卷号: 238, 页码: 16
作者:  
Rakovitis, Nikolaos;  Li, Dan;  Zhang, Nan;  Li, Jie;  Zhang, Liping
  |  收藏  |  浏览/下载:27/0  |  提交时间:2022/06/15
The distributed assembly permutation flowshop scheduling problem with flexible assembly and batch delivery 期刊论文  OAI收割
International Journal of Production Research, 2021, 卷号: 59, 期号: 13, 页码: 4053-4071
作者:  
Yang SL(杨圣落);  Xu ZG(徐志刚)
  |  收藏  |  浏览/下载:17/0  |  提交时间:2020/05/24
Adaptive population NSGA-III with dual control strategy for flexible job shop scheduling problem with the consideration of energy consumption and weight 期刊论文  OAI收割
Machines, 2021, 卷号: 9, 期号: 12, 页码: 1-24
作者:  
Wu, Mingliang;  Yang DS(杨东升);  Zhou BW(周博文);  Yang ZL(杨之乐);  Liu, Tianyi
  |  收藏  |  浏览/下载:31/0  |  提交时间:2022/01/13
An Adaptive Multi-Strategy Artificial Bee Colony Algorithm for Integrated Process Planning and Scheduling 期刊论文  OAI收割
IEEE ACCESS, 2021, 卷号: 9, 页码: 65622-65637
作者:  
Cao Y(曹阳);  Shi HB(史海波)
  |  收藏  |  浏览/下载:30/0  |  提交时间:2021/05/13
Multi-objective optimisation in flexible assembly job shop scheduling using a distributed ant colony system 期刊论文  OAI收割
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2020, 卷号: 283, 期号: 2, 页码: 441-460
作者:  
Zhang, Sicheng;  Li, Xiang;  Zhang, Bowen;  Wang, Shouyang
  |  收藏  |  浏览/下载:35/0  |  提交时间:2020/05/24
An Adaptive Multi-population Artificial Bee Colony Algorithm for Multi-objective Flexible Job Shop Scheduling Problem 会议论文  OAI收割
Nanchang, China, June 3-5, 2019
作者:  
Cao Y(曹阳);  Shi HB(史海波)
  |  收藏  |  浏览/下载:34/0  |  提交时间:2019/11/13
Flexible Assembly Job-Shop Scheduling With Sequence-Dependent Setup Times and Part Sharing in a Dynamic Environment: Constraint Programming Model, Mixed-Integer Programming Model, and Dispatching Rules 期刊论文  OAI收割
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2018, 卷号: 65, 期号: 3, 页码: 487-504
作者:  
Zhang, Sicheng;  Wang, Shouyang
  |  收藏  |  浏览/下载:15/0  |  提交时间:2019/12/13